      
|
Private
Yacht, Pacific Coast
Stepping
on board in San Diego to assist with a superyacht’s remodel, Patané
covered projects from cleaning the bilge in the engine room to reupholstering
interior overhead panels. Other work included carpentry, appliance installation,
plumbing, duct work, boat cleaning, expediting and boat maintenance.
Her handiwork led to a crew position for
the yacht's delivery to Costa Rica. She handled projects while underway,
and was involved with watchkeeping and hourly engine room checks. Upon
the yacht's arrival, Patané continued projects with post-delivery
repair work.
|
Romanced
By the One You Work For: meet Ti [Gallery]
Bow
Railing Repair
Teak
Door
Crew
Shower Repair

|
| Overhead
Panel Project

A view
of the overhead in the salon after removing the panels.

After panels get recovered, they get stacked for 3M Dual Lock™ fastening.
|

Media consultant,
John Monte, shared his picture of Alaska Handywoman at work on the superyacht.

Using
a metric tape measure is often preferred over English inches.
|